TOTAL COST TI QUAN.| UNIT "TOA QyT-L DESCRIPTION OF PROPERTY UNITS LAGOON STATION NOS. 640.01 THRU 640.04 A wood framed and decked raft 24'-7-1/2" long x 15'-5" wide with 26 cil drum floats supporting a triangular wood and canvas framed lou- vered and fins 10'-0" high x 10'-5" at the base, raft anchored in Lagoon with Northill galvanized utility anchors. (No installed equipment. ) Construction Contract Cost. Engineering Cost 4 Bach 27,977.10 1,566.88 29,543.98 AS LISTED BELOW STATION NOS. 641.01 THRU 641.04 A twenty foot high telephone pole, with painted black and white stripes set erect in the reef. Locations: reef reef reef reef near near near near Janet Ursula & Yvonne Yvonne Elmer Construction Contract Cost Engineering Cost \ 5,745 94 8.36 Each 5,754.30 XIGNAddV Station No. 641.01 Station No. 641.02 Station No. 641.03 Station No. 641.04 (No installed equipment. )