TOTAL COST II YVONNE (Continued) “TOA tHT-L QUAN. UNIT DESCRIPTION OF PROPERTY UNITS STATION NOS. 617.03 THRU 615.08 An 8" diameter, extra strong, pipe columnwith a 1/2" x 9" steel plate leading edge welded thereto, extending approximately 12'-0" vertically above a "Tee" shaped reinforced concrete base, in which the lower end is embedded, topped with a 3" diameter extra strong pipe extending 2'-O" above it's top, capped by a cross fitting. There are three steel guys to deadmen anchors in the concrete base. The stem section of the "Tee" base which varies in size, is approximately 4'°-0" wide x 24*-0" long x 3'-O" deep. The cross bar of the "Tee" base is approximately 3'-0O" wide x 30'-0" long x 3'-0" deep. (No installed equipment. ) Construction Contract Cost Engineering Cost 48,921.07 2,148.25 51,069.32 STATION NO. 618 A 15'-0O" high mast of 8" double extra heavy pipe, provided with opening for cable entrance, set in a rectangular reinforced concrete Construction Contract Cost Engineering Cost 7,189 .83 278.07 Bach 7467.90 XIGNaAddvV footing 6'-0" x 18'-0" x 3'-0O" deep; includes a reinforced concrete battery box 2'-6" square 3'-9" deep, with removeable steel plate top and 3" diameter steel conduit for cables. (No installed equipment. )