QUAN.|

UNIT

TOTAL
cost

AS LISTED BELOW (Continued)

iI “"IOA

DESCRIPTION OF PROPERTY UNITS

STATION NOS, 613.01 AND 613.02 (Continued)
Locations:

Station No. 613.01
Station No. 613.02
(‘No installed equipment. )

Olive
Yvonne
Construction Contract Cost
Engineering Cost

2

Each

3,287 .08
294.54

3,581.62

GENE
STATION NO. 614

A reinforced concrete cube 1'-6" x 1'-6" x 1'-6" with two embedded
conduits furnished by the User.

(No installed equipment. )

Construction Contract Cost
Engineering Cost

667 .74
54. 3h

1

Bach

722.08

AS LISTED BELOW

A reinforced concrete cube 1'-6" x 1'-6" x 1'-6" with three embedded

THT-

conduits furnished by the User.

XIGNaddV

STATION NOS. 615.01 AND 615.02