UNIT TOTAL COST II QUAN.| “TOA OnT-L DESCRIPTION OF PROPERTY UNITS AS LISTED BELOW (Continued) STATION NOS. 611.02 THRU 611.04 (Continued) 3'-6" x h'-0" x 3°-9" deep O.D. Locations: Station No. 611.02 Station No. 611.03 Station No. 611.04 (No installed equipment. ) Kate Mary Sally Construction Contract Cost. Engineering Cost 3 Each 23,469.18 1,134.09 24 603 PT ELMER STATION NO. 612 3,263.92 305.19 AS LISTED BELOW STATION NOS. 613.01 AND 613.02 Reinforced concrete pad 9'-0" x 3'-0" x 3'-0" thick, placed at grade level, supporting one 8" diameter vertical pipe 10'-O" high. Each 3.569.411 “y Construction Contract Cost Engineering Cost 1 XIGNaAddV¥ Reinforced concrete slab 5'-O" x 2'-0" x 5'-0" thick, placed at grade level, supporting two vertical 8" diameter pipes 15‘-0" high. (No installed equipment. )