TOTAL
COST

IT

KATE (Continued)

“TOA

9€ToL

QUAN. UNIT

DESCRIPTION OF PROPERTY UNITS

STATION NO, 602 (Continued)
Installed equipment: 3 - 5 KVA "General Electric" transformers,
serial Nos. B-266472, B-266434, B-266431, H & N Nos. TR-46, TR-47,
TR~-L9.

(The above list does not contain any user-furnished or user-installed

equipment. )

Allocated to all Stations

SUB-STATION NO. 602
Sub-station No. 602 consists of three transformers installed in con-

junction with Station No. 602.

Includes all necessary cutouts.

switches, wiring, conduits, and fittings.

Bach

Installed equipment: 3 - 5 KVA "General Electric" transformers,
serial Nos. B-266472, B-266434, and B-222431; H & N Nos. TR-46, TR-

47, and TR-49.

(The above list does not contain any user-furnished or user-installed

equipment. )

Construction Contract Cost

Engineering Cost

8, 378.48

456.36

8, 834.84

STATION NO. 603

Reinforced concrete structure 10'-8" x 24'-8" x 10'-k" high O.D.
with 1°-O" thick walls and roof and 1'-4" thick floor slab; embedded
unistruts in walls, ceiling and deck; divided into two rooms by a

XIGNGYddV

MARY

Select target paragraph3