QUAN. UNIT

TOTAL
COST

II

JANET

“TOA

DESCRIPTION OF PROPERTY UNITS

STATION NO. 601
Consists of reactivation of Greenhouse Station 301J complete with

electrical light and power wiring and fixtures, ventilating and

power generating equipment.

(No installed equipment. )

Each

Allocated to all Stations

SUB-STATION NO. 601
Sub-station No. 601 consists of three transformers installed in conjunction with Station No.-601.
Includes all necessary cutouts,

switches, wiring, conduits, and fittings.
Installed equipment:

Bach

2 - 15 KVA "Gregory" transformers, serial Nos.

5026277 and (none), H & N Nos. TR-135 and TR-151; 1 - 15 KVA "AllisChalmers" transformer, serial No. 2248616, H & N No. TR-152.

(The above list does not contain any user-furnished or user-installed

equipment. )

Construction Contract Cost
Engineering Cost

11,641.27
355 -63

11,996.90

STATION NO. 602
Consists of reactivation of Greenhouse Station 301H complete with

electrical light and power wiring and fixtures, ventilating and

GEtoL

power generating equipment.

Each

XIGNaAddV

KATE