QUAN.) UNIT nsose II AS LISTED BELOW (Continued) “TOA DESCRIPTION OF PROPERTY UNITS STATION NOS. 541.02 THRU 541.33 (Continued) LOCATIONS: (Continued) 1 Station on Pearl 2 Stations on Leroy 2 Stations on Ruby 1 Station on Mac 1 Station on Sally 33 (No installed equipment. ) Construction Contract Cost Engineering Cost Each 23,688.81 23,944.89 256 .08 STATION NOS. 542.01 THRU 542.08 Reinforced concrete shapes consisting of horizontal slabs 9'-4" wide x 1'-O" thick varying in length from 7'-0" to 11'-1"; with vertical wall 9'-4" wide x 1'-O" thick varying in height from 5'-8" to 10'-0". LOCATIONS: Station No. 542.01 Alice Station No. 542.02 Janet Station No. 542.03 Nancy Station No. 542.04 Wilma Station No. 542.07 Elmer Station No. 542.08 Fred (No installed equipment. ) Construction Contract Cost Eel Engineering Cost 8 19,934.71 451.99 Each 20, 386.70 XIGNGddV Station No. 542.05 Yvonne Station No. 542.06 Bruce