QUAN.)

UNIT

nsose

II

AS LISTED BELOW (Continued)

“TOA

DESCRIPTION OF PROPERTY UNITS

STATION NOS. 541.02 THRU 541.33 (Continued)
LOCATIONS:

(Continued)

1 Station on Pearl

2 Stations on Leroy

2 Stations on Ruby

1 Station on Mac

1 Station on Sally

33

(No installed equipment. )

Construction Contract Cost

Engineering Cost

Each

23,688.81

23,944.89

256 .08

STATION NOS. 542.01 THRU 542.08
Reinforced concrete shapes consisting of horizontal slabs 9'-4" wide

x 1'-O" thick varying in length from 7'-0" to 11'-1"; with vertical
wall 9'-4" wide x 1'-O" thick varying in height from 5'-8" to 10'-0".

LOCATIONS:

Station No. 542.01 Alice

Station No. 542.02 Janet

Station No. 542.03 Nancy
Station No. 542.04 Wilma

Station No. 542.07 Elmer
Station No. 542.08 Fred
(No installed equipment. )

Construction Contract Cost

Eel

Engineering Cost

8
19,934.71

451.99

Each

20, 386.70

XIGNGddV

Station No. 542.05 Yvonne
Station No. 542.06 Bruce

Select target paragraph3