TOTAL
COST

II

CLARA (Continued )

“TIOA

QUAN. UNIT

DESCRIPTION OF PROPERTY UNITS

STATION NO. 520 (Continued)
leg and one 17-0" leg, 3'-0" wide x approximately 8'-0" high inside,
with 3°-0" walls, 2'-6" floor and 2'-kh" roof; retaining walls each
consist of a base i4'-3" long, 1'=-3" thick, which tapers from 9'-7"
wide to 2'=3" with a wall 17°-3" high tapering to 6'-0" high and from
1'-0" thick at the base to 8" at the top; complete with electrical
wiring and fixtures; plumbing for air conditioner and dry condenser};

entire structure covered to a depth of approximately 6°-0" and slopes
covered with bags of cement and coral aggregate.

Installed equipment:

Bach

1 “Kilpatrick” evaporator dehumidification unit,

serial No. 102750.17, H & N No. A-112-B; 1 "Kilpatrick" condensor
dehumidification unit, serial No. 122950.32, H & N No. A-131; 2 = 50

KW “International-Harvey" portable generator units, serial Nos. UDR22988, UDR-22999, H & N Noa. G65, G-68.
(The above list does not contain any user-furnished or user-installed
equipment. )

Construction Contract Cost

Engineering Cost

139,656.19

8,850.00

148,506.19

AS LISTED BELOW

6cT- 2

2k" diameter pipe, sealed at the bottom with 3/8" steel plate, set
18'-0" below grade and collared at grade level with 6'-6" square reinforced concrete pad 1'-6" thick.

XIGNGddvV

STATION NOS. 521.01 THRU 521.06