TOTAL COST II CLARA (Continued ) “TIOA QUAN. UNIT DESCRIPTION OF PROPERTY UNITS STATION NO. 520 (Continued) leg and one 17-0" leg, 3'-0" wide x approximately 8'-0" high inside, with 3°-0" walls, 2'-6" floor and 2'-kh" roof; retaining walls each consist of a base i4'-3" long, 1'=-3" thick, which tapers from 9'-7" wide to 2'=3" with a wall 17°-3" high tapering to 6'-0" high and from 1'-0" thick at the base to 8" at the top; complete with electrical wiring and fixtures; plumbing for air conditioner and dry condenser}; entire structure covered to a depth of approximately 6°-0" and slopes covered with bags of cement and coral aggregate. Installed equipment: Bach 1 “Kilpatrick” evaporator dehumidification unit, serial No. 102750.17, H & N No. A-112-B; 1 "Kilpatrick" condensor dehumidification unit, serial No. 122950.32, H & N No. A-131; 2 = 50 KW “International-Harvey" portable generator units, serial Nos. UDR22988, UDR-22999, H & N Noa. G65, G-68. (The above list does not contain any user-furnished or user-installed equipment. ) Construction Contract Cost Engineering Cost 139,656.19 8,850.00 148,506.19 AS LISTED BELOW 6cT- 2 2k" diameter pipe, sealed at the bottom with 3/8" steel plate, set 18'-0" below grade and collared at grade level with 6'-6" square reinforced concrete pad 1'-6" thick. XIGNGddvV STATION NOS. 521.01 THRU 521.06