Construction Contract Coat
Engineering Cost

16,100.98
286 . 27

16, 387.25

FLORA TO IRENE
STATION NO. 204 AND AUXILIARY STRUCTURES

A timber, frame flume, 8'-0" x 8'-0" I.D., in nine lineal sections

totaling 8,860 lineal feet long; interior sheathed all around with
plywood and full reinforced paper lining over 2" x 4" framing. Flume
is supported a variable distance above grade by 4" x 4" diagonally
braced posts spaced 8'-0" apart, and 4" x 6" diagonally braced posta
spaced 12'-0" apart, all on 4'-0" deep concrete footings.

Bach

(No installed equipment. )
"Chic Salea" Houses:

Adjacent to, and spaced along Station No. 20h

hk" wood sleeper, with plywood floor and exterior sheathing, aluminum

roof; complete with light, power and communication wiring and fixtures.

ETt-L

(No installed equipment. )