QUAN.| UNIT

TOTAL
COST

II

LEROY (Continued)

"TOA

BoT-L

DESCRIPTION OF PROPERTY UNITS

STATION NO. 52 (Continued )

(No installed equipment. )
Construction Contract Cost

Engineering Cost

7,373.35

147.77

7,521.14 ,

ELMER

STATION NO, 53
A 28°-3" x 28'-3" x 17'-O" high radar reflector with one transformer
mounted on pole, complete with fuse cutout, switch, rack, wiring,

conduit, and fittings.

Installed equipment:

transformer.

(Installation of light fixtures deleted. )

1

Each

1 - 10 KVA, 2400 - 120/2h0 voit, single phase
Construction Contract Cost
Engineering Cost

2,236.77
137.49

2,374.26

TRENE

6057-I-3
6058-I-3
6060-I-3
6066-I-3
6069-I-3
6074-T-3

6079-1-3
6085-I-3
6089-1-3
6090-I-3
6117-I-3