QUAN.| UNIT TOTAL COST II LEROY (Continued) "TOA BoT-L DESCRIPTION OF PROPERTY UNITS STATION NO. 52 (Continued ) (No installed equipment. ) Construction Contract Cost Engineering Cost 7,373.35 147.77 7,521.14 , ELMER STATION NO, 53 A 28°-3" x 28'-3" x 17'-O" high radar reflector with one transformer mounted on pole, complete with fuse cutout, switch, rack, wiring, conduit, and fittings. Installed equipment: transformer. (Installation of light fixtures deleted. ) 1 Each 1 - 10 KVA, 2400 - 120/2h0 voit, single phase Construction Contract Cost Engineering Cost 2,236.77 137.49 2,374.26 TRENE 6057-I-3 6058-I-3 6060-I-3 6066-I-3 6069-I-3 6074-T-3 6079-1-3 6085-I-3 6089-1-3 6090-I-3 6117-I-3 ra 2059-I-19 3051-I-3 3080-I-3 hokl-T-3 4Oh2-1T-3 4hOk3-I-3 XIGNAddVv STATION NO. 200