CONTRACT NO. "TIOA COMPLETION REPORT for AT-(29-2)-20 DESCRIPTION OF PROPERTY UNITS II OPERATION IVY QUAN. UNIT TOTAL COST FLORA TO IRENE CAUSEWAY Construction of the causeway, including the coax cover, includes an estimated 215,000 cubic yards of coral excavation and fill; 3660 lineal feet of bulkhead, consisting of 40 pound rail piling supporting a 3" x 6" timber wall approximately 12'-0" high backed up by rock fill; and 430 cubic yards of sand cushion for underground power and coax cables, atabilized top. rach (No installed equipment. ) Construction Contract Cost Engineering Cost 297,888.10 12,399.71 310,287.81 ALL SITES POWER DISTRIBUTION Construction of the underground power distribution system for the sci- NOTE: Descriptions of portable generating units and transformers are included in the Completion Reports of the station in which they occur. Timing cables, furnished by the government installed in 36” trenches to Users equipment. S6-L Allocated to all Stations XIGNaGddv entific program includes survey, excavation and backfill, and installation of approximately 20,590 lineal feet of new 3/c 5 KV Neoprene JKT cable. Rehabilitation of previously installed cable connecting existing stations; special conduit runs, service connections to stations and transformers and installations and connection of various portable generating units for special power requirements.