UNIT TOTAL COST MwO 122: Site Elmer: (Continued) electrical wiring, conduits, and fixtures. Construction Contract Cost Engineering Cost MWO 123: Bach 3,508 .87 147.90 3,656.77 All Sites; A new sea mule was constructed using materials available at the jobsite, and salvage materiale from the present barge, (a self-propelled pontoon barge, with A-frame, H & N No. 101). Construction Contract Cost Mwo 12h: I] ITEM No. A-35 - MISCELLANEOUS MAINTENANCE WORK ORDERS (Continued ) “TOA 06-2 QUAN. DESCRIPTION OF PROPERTY UNITS Site - Fred: 13,758.42 Bach 13,758.42 Repairs were made to the Cargo Pier, Structure No. 140, by installing sheet steel piling at the share and bulkheads, and placing fill and cement grout as necessary. EMWO 125: Site - Fred: Additional Storage Space in Building 403. Construct and inetall parts bins and construct second floor decking in Parts Warehouse, Jumbo Quonset No. 403. All in accordance with details furnished by the Warehouse Supervisor. Install eight lights in proposed hot locker room. Construction Contract Cost h ASH. 33 h USK. 33 XIQGNGddvV Costs Included in Job III <= Maintenance