II

TOTAL
COST

“TOA

QUAN. UNIT

DESCRIPTION OF PROPERTY UNITS
FRED (Continued)
DAIRY REFRIGERATOR

A portable refrigerator, 675 cubic feet capacity, set on timber skids.

Complete with lighting and power wiring.

others.

Refrigerator furnished by

Bach

E.C.0. 3706 authorizes the redesigning and rebuilding of a range hood,

H & N No. K-349, AEC No. 5749, with three fans, and the installation

of the hood into Building 36.

Bach

Construction Contract Cost
Engineering Cost

9,086.56
108.25

9,194 BL

FX - ADDITION TO

E.C.0. 864 authorizes the addition of a one-story aluminum structure,
rectangular shape, 0.D. 25'-2" x 28'-0" x 10'-10" mean height, set.

on a 5" thick concrete slab, double roof, separated by 3" x 4" redwood.
Complete with electrical wiring and fixtures and shelving.
Floor area 0.D. 705 square feet, volume 7638 cubic feet.

(No installed equipment.)

Construction Contract Cost

Bach

1,063.27

1,063.27

consisting of approximately 600 lineal feet of 2 - #8 weatherproof

wire, and one weatherproof receptacle.

(No installed equipment. )

Army furnished poles,

.

Each

J

E.C.0. 934A authorizes the installation of new electrical servicer

XIGNGAddV¥

SKEET RANGE - ADDITIONS TO

Select target paragraph3