TOTAL COST II ELMER, CMR AREA (Continued) “TOA gl-L QUAN. UNIT DESCRIPTION OF PROPERTY UNITS SEWER SYSTEM - SANITARY AND COOLING WATER WASTE (Continued) Central Section (Continued) lineal feet of 18" VCP, 25 lineal feet of 12" VCP, 519 lineal feet of 8" VCP, 55 lineal feet of 6" VCP and 6 standard manholes. The out- fall lines extends into the lagoon. North Section A combined cooling water waste and sanitary sewer consisting of 102 lineal feet of 8" VCP and one standard manhole, extends into the lagoon. The outfall line (No installed equipment. ) Construction Contract Cost Engineering Cost Bystem 29,878.14 5364.24 35,242.38 TANK ~- SALT WATER ELEVATED A 30'-O" high salt water tank and tower, located approximately 95 feet east of Building 345A. Tower is constructed of 10" x 10" wood columns with a 4" x 12" beam platform, and contains the required bracing, ladder, and painting platform. concrete footings 4'-6" below grade. It is supported by reinforced The tank has a capacity of approximately 500 barrels and contains a 12" outlet and inlet pipe Installed equipment: 1 - 700 bbl, jobsite fabricated, bolted steel tank, H & N No, PI-60. , Each XIGNGddvV with a 2-1/2" fire hose connection, valves, and nipples.