ELMER, CMR AREA (Continued)

“TOA

gl-L

QUAN. UNIT

DESCRIPTION OF PROPERTY UNITS

SEWER SYSTEM - SANITARY AND COOLING WATER WASTE (Continued)

Central Section (Continued)
lineal feet of 18" VCP, 25 lineal feet of 12" VCP, 519 lineal feet of
8" VCP, 55 lineal feet of 6" VCP and 6 standard manholes. The out-

fall lines extends into the lagoon.
North Section

A combined cooling water waste and sanitary sewer consisting of 102

lineal feet of 8" VCP and one standard manhole,

extends into the lagoon.

The outfall line

(No installed equipment. )
Construction Contract Cost

Engineering Cost

Bystem

29,878.14

5364.24

35,242.38

TANK ~- SALT WATER ELEVATED

A 30'-O" high salt water tank and tower, located approximately 95
feet east of Building 345A. Tower is constructed of 10" x 10" wood
columns with a 4" x 12" beam platform, and contains the required

bracing, ladder, and painting platform.

concrete footings 4'-6" below grade.

It is supported by reinforced

The tank has a capacity of

approximately 500 barrels and contains a 12" outlet and inlet pipe

Installed equipment: 1 - 700 bbl, jobsite fabricated, bolted steel
tank, H & N No, PI-60.
,

Each

XIGNGddvV

with a 2-1/2" fire hose connection, valves, and nipples.