TOTAL COST II ELMER, CMR AREA (Continued) “TOA OL-L QUAN. UNIT DESCRIPTION OF PROPERTY UNITS PUMP STATION - SALT WATER (Continued) No. PU-10, PU-11, PU-12, PU-13; 1 - ee" diameter "Hardesty" sluice gate, (no serial No.), H & N No. PL-64; 1 - 2" stem "Hardesty" lift pedestal, (no serial No.), H & N No, PL-65. (The above list does not contain any user-furnished or user-installed equipment. ) Construction Contract Cost Engineering Cost 123,572.81 2,945.05 126,517 .86 ROADS AND AREAS - STABILIZED Stabilized roads and areas consist of stabilized coral, with grades determined in the field. Roads are 20°-0" wide. Quantity of new roads and new paved areas are approximately as follows: (No installed equipment. ) 3,725 sq. yards 740 sq. yards 303,350 sq. yards Construction Contract Cost Engineering Cost 73,820.85 188 .27 Lad Roads, new, stabilized Roads, rebuilt, stabilized Areas, new, stabilized OF 815 4 tg. Yay 74,009.12 Piping consists of the following amounts, sizes, and types: vy An underground piping system for distributing salt water for cooling purposes from Building 347 to Buildings 330, 339, 344, and 349. XIGNGddV SALT WATER DISTRIBUTION SYSTEM - COOLING