TOTAL
COST

II

ELMER, CMR AREA (Continued)

“TOA

OL-L

QUAN. UNIT

DESCRIPTION OF PROPERTY UNITS

PUMP STATION - SALT WATER (Continued)
No. PU-10, PU-11, PU-12, PU-13; 1 - ee" diameter "Hardesty" sluice

gate, (no serial No.), H & N No. PL-64; 1 - 2" stem "Hardesty" lift
pedestal, (no serial No.), H & N No, PL-65.
(The above list does not contain any user-furnished or user-installed
equipment. )
Construction Contract Cost

Engineering Cost

123,572.81

2,945.05

126,517 .86

ROADS AND AREAS - STABILIZED
Stabilized roads and areas consist of stabilized coral, with grades

determined in the field.
Roads are 20°-0" wide.
Quantity of new
roads and new paved areas are approximately as follows:

(No installed equipment. )

3,725 sq. yards

740 sq. yards

303,350 sq. yards

Construction Contract Cost
Engineering Cost

73,820.85
188 .27

Lad

Roads, new, stabilized
Roads, rebuilt, stabilized
Areas, new, stabilized

OF 815 4 tg. Yay
74,009.12

Piping consists of the following amounts, sizes, and types:

vy

An underground piping system for distributing salt water for cooling

purposes from Building 347 to Buildings 330, 339, 344, and 349.

XIGNGddV

SALT WATER DISTRIBUTION SYSTEM - COOLING

Select target paragraph3