II TOTAL COST “TOA QUAN. UNIT DESCRIPTION OF PROPERTY UNITS BIMER, CMR AREA (Continued) POWER DISTRIBUTION (Continued) Three 4" transite ducts and four pull boxes were installed under the airport. Where the tie-line crosses the airport, three single conductor #4 /0 neoprene jacketed cables, each 800 feet long, were in- stalled in one of the 4" transite ducts. The distribution lines to Stations 606 and Tower Stations 301 and 805 conaist of three #1/0 bare stranded copper cables, each 1350 feet long, with twelve 40 foot poles complete with crossarms, guys and nardware. Six transformers were installed on poles. Bystem Installed equipment: 1 - 100 KVA “Westinghouse” transformer, serial No. 5394934: 2 - 75 KVA "Niagara-Erie Electric Company” transformers, serial Nos. 12670 and 12856. (The above list does not contain any user-furnished or user-installed equipment. ) Construction Contract Cost Engineering Cost 23,249.77 876.58 24 126.35 POWER PLANT 1009-{EE-4 1013-EE-4 3006-EE-4 5 September 1952 5 September 1952 5 September 1952 30L1-BE-4 3012-EB-4 3014-EE-} 5 September 1952 5 September 1952 5 September 1952 3008-EE-4 3009-EE-) 5 September 1952 5 September 1952 4001-EE-4 4002-EE-4 6 September 1952 5 September 1952 3007-EE-4 TLeL 3010-EE-4 5 September 1952 5 September 1952 3052-EE-4 4003-EE-4 5 September 1952 11 September 1952 XIGNGddV As-built Drawing Numbers and Dates: