TOTAL
COST

II

ELMER, CMR AREA (Continued )

“TOA

oL°L

QUAN. UNIT

DESCRIPTION OF PROPERTY UNITS

LIGHTING - SECURITY (Continued)
E.C.0. 279 consists of providing a head guy and a guy stub at poles

numbers 16 & 20, E.C.0. 284 consists of the installation of an oute
door floodlight at Building 344, CMR Area.

Installed equipment:

Syatem

1 "Westinghouse" o11 switch, serial No. 343293,

H & N No. E-353; 1 “Westinghouse” protective relay, serial No. 343683,
K&N No. E-354; 1 2ho0o V. 6.6 Amp. “Westinghouse” regulator, serial

No. 1590703, H & N No. E-355.
|
(The above list does not contain any user-furnished or user-installed
equipment. )
Construction Contract Cost
Engineering Cost

8,039.73
1,097.26

9,136:99

POWER DISTRIBUTION

A tie-line consisting of three #4/0 AWG bare copper wire, each 6920

feet long was installed with new srosgarms on existing poles to feed
power from the CMR Power Plant to the distribution panels at Building

301 (existing Power House).

The electrical alterations to Building 301 consist of installing size
200 Amp. SPDT switches and three SPST switches to provide means to
transfer power onto the distribution lines from either the CMR Power

The existing transformers (two 75 KVA

and one 100 KVA) were relocated from the platform between poles 285
and 29E to a new sub-station enclosed with 62'-0" of chain link fence.
Three additional transformers, (two 75 KVA and one 1090 KVA) were also
installed in this sub-station.

XIGNGddV

Plant or from the tie-line.