TOTAL
COST

il

ELMER, CMR AREA (Continued )

"TIOA

(gged

UNIT

DESCRIPTION OF PROPERTY UNITS

ELECTRICAL DISTRIBUTION SYSTEM (Continued)
various sizes: 2400 volt underground conductor in conduit, of various

Sizes; and service drop triple braid WP wire. This power distribution
System also serves the baseball field, which is adjacent to the CMR

Area,

Each

Installed equipment: 2 - 5 KVA transformers, serial Nos. 227610,
2247627, H & N TR-4L, TR-45: 3 - 10 KVA transformers, serial Nos.

1057806, 1068589, 1057787, H & N Nos. TR-78, TR-79, TR-80.

(The above list does not contain any user-furnished or user-installed
equipment. )

Construction Contract Cost
Engineering Cost

76,195.26
2 872.74

79,068.00

FENCING - SECURITY

Security fencing, CMR Area, consists of 2" wire chain mesh with 2"

H-section posts set in concrete at approximately 10'-0" on center.
Each post has a bracket on top, which holds 3 strands of barbed wire.

Typical fence is 8'-0" high excluding height of barbed wire top.

Fencing for the sub-stations are described in the sub-stations in
which they occur.

Jin. Ft.

XIONGddVv

Fencing, removed and rearranged - 1161 lineal feet
Fencing, new = 1140 lineal feet
Fence gates, 6'-0" wide - 2 Each
Fence gates, 5'-0" wide - 2 Each

Select target paragraph3