ELMER, CMR AREA (Continued)

“TIOA

99~L

DESCRIPTION OF PROPERTY UNITS

SUB-STATION 344 (T-24) (Continued )
foundation around the perimeter. Includes a 2" mesh chain link fence,
8*-0" high with 3 strands barbed wire on top, and an entrance gate on
the north side. Over-all area is 142 square feet.
Installed equipment:

1

Each

1 - 1250 KVA "Westinghouse" outdoor transformer,

Serial No. 3110466, H & N No. TR-226,

(The above list does not contain any user-furnished or user-installed

equipment. )

Construction Contract Cost

Engineering Cost

28,904.25
1,089.76

29,994.01

BUILDING 345 (UNITS A AND B)
Reinforced concrete foundations for cylinder container frames.

Each

unit consists of two parallel foundations, 19'-0" c.c, extending from
1'=6" below grade to 2'-0" above grade, length 90'-0": building com-

prised of two units, A and B.

(No installed equipment. )

Construction Contract Cost
Engineering Cost

12,043.65
481.43

1

Each

12,525.08

Communications System, CMR Area, consists of speakers, amplifiers,
telephone terminal cabinets, telephone outlets, pull boxes, and all
the required cables, wires and conduits. Speakers are located as

XIGNAddV

COMMUNICATIONS SYSTEM