QUAN.) UNIT TOTAL COST II ELMER, CMR AREA (Continued) “TIOA 99~L DESCRIPTION OF PROPERTY UNITS SUB-STATION 344 (T-24) (Continued ) foundation around the perimeter. Includes a 2" mesh chain link fence, 8*-0" high with 3 strands barbed wire on top, and an entrance gate on the north side. Over-all area is 142 square feet. Installed equipment: 1 Each 1 - 1250 KVA "Westinghouse" outdoor transformer, Serial No. 3110466, H & N No. TR-226, (The above list does not contain any user-furnished or user-installed equipment. ) Construction Contract Cost Engineering Cost 28,904.25 1,089.76 29,994.01 BUILDING 345 (UNITS A AND B) Reinforced concrete foundations for cylinder container frames. Each unit consists of two parallel foundations, 19'-0" c.c, extending from 1'=6" below grade to 2'-0" above grade, length 90'-0": building com- prised of two units, A and B. (No installed equipment. ) Construction Contract Cost Engineering Cost 12,043.65 481.43 1 Each 12,525.08 Communications System, CMR Area, consists of speakers, amplifiers, telephone terminal cabinets, telephone outlets, pull boxes, and all the required cables, wires and conduits. Speakers are located as XIGNAddV COMMUNICATIONS SYSTEM