QUAN.}| UNIT TOTAL COST IT ELMER, CMR AREA (Continued ) "TOA o9ek DESCRIPTION OF PROPERTY UNITS SUB-STATION 342 (T-25) (Continued ) (The previous list does not contain any user-furnished or user-installed equipment. ) Construction Contract Cost Engineering Cost 7,273.57 274,23 7,547.80 BUILDING 344 As-built Drawing Numbers and Dates: 11 September 1952 6 September 1952 6063-BE-2 606h4-EER-2 11 September 1952 6077-EE-2 3038-EE-2 ll September 1952 3041-EE-2 17 September 1952 3040-EE-2 4012-ER-2 4O34-EE-2 4035-EE-2 hO36-RE-2 11 11 11 11 6061-EE-2 11 September 1952 4O37-EE<=2 6054-EE-2 6055-EE-2 6062-EE-2 September September September September 1952 1952 1952 1952 1l September 1952 11 September 1952 11 September 1952 11 September 1952 6076-ER-2 11 September 1952 11 September 1952 11 September 1952 11 September 1952 6078-ER-2 11 September 1952 FS-799 FS-787 FS-788 17 September 1952 6081-EE-2 6083-EE-2 6102-EE-2 6107-EE-2 11 11 11 11 September September September September 1952 1952 1952 1952 ¥FS-789 A one-story structure, irregular in shape, with over-all outside di- mensions of 90'-6" long x 83'-0" wide. ‘he total floor area is 6586 Square feet, and the volume is approximately 125,408 cubic feet. The building consists of two types of construction, the main portion of which is 80'-6" long x 54"-0" wide, with a hip roof of 16'-0O" high XIGNAddV 1038-EE=-2 1042-EE-2