QUAN.}| UNIT

TOTAL

COST

IT

ELMER, CMR AREA (Continued )

"TOA

o9ek

DESCRIPTION OF PROPERTY UNITS

SUB-STATION 342 (T-25) (Continued )
(The previous list does not contain any user-furnished or user-installed equipment. )
Construction Contract Cost
Engineering Cost

7,273.57
274,23

7,547.80

BUILDING 344

As-built Drawing Numbers and Dates:
11 September 1952
6 September 1952

6063-BE-2
606h4-EER-2

11 September 1952

6077-EE-2

3038-EE-2

ll September 1952

3041-EE-2

17 September 1952

3040-EE-2

4012-ER-2
4O34-EE-2
4035-EE-2
hO36-RE-2

11
11
11
11

6061-EE-2

11 September 1952

4O37-EE<=2
6054-EE-2
6055-EE-2

6062-EE-2

September
September
September
September

1952
1952
1952
1952

1l September 1952
11 September 1952
11 September 1952

11 September 1952

6076-ER-2

11 September 1952
11 September 1952
11 September 1952

11 September 1952

6078-ER-2

11 September 1952

FS-799
FS-787
FS-788

17 September 1952

6081-EE-2
6083-EE-2
6102-EE-2
6107-EE-2

11
11
11
11

September
September
September
September

1952
1952
1952
1952

¥FS-789

A one-story structure, irregular in shape, with over-all outside di-

mensions of 90'-6" long x 83'-0" wide.

‘he total floor area is 6586

Square feet, and the volume is approximately 125,408 cubic feet.

The

building consists of two types of construction, the main portion of

which is 80'-6" long x 54"-0" wide, with a hip roof of 16'-0O" high

XIGNAddV

1038-EE=-2
1042-EE-2

Select target paragraph3