TOTAL
COST

II

ELMER, CMR AREA (Continued)

"TOA

QUAN. UNIT

DESCRIPTION OF PROPERTY UNITS

BUILDING 341 (Continued)
Watt "RCA" amplifiers, (no serial Nos.) H & N No. B-341, No. E-3h2;

1 - 2h" x 18" x 4” “Mullenbach” surface terminal cabinet, serial No.

18244, H & N No. E-335;

H & N No. E-372;

1- 208 Y, main switchboard, (no serial No.),

1 = 10 gallon “Larco" water cooler, serial No.

9J07007 H & N No. CA-140; 1 "Kilpatrick" condensor dehumidification
unit, serial No, 81450-10, H & N No. A-89-B; 1 = "Kilpatrick" evapo-

rator dehumidification unit, serial No. 81450-2, H & N No. A-79-A;
1 vBCAY control console with microphone, (no serial No.), H & N No.
E-169.

(The above list does not contain any user-furnished or user-installed

equipment. )

Construction Contract Cost

Engineering Cost

187,200.63

193, 008.28

5,807.65

SUB-STATION 341 (T-27)

Reinforced concrete slab located 9'-0" west of Building 341; dimen-

sions 9'-0" long x 6'-6" wide x 6" thick, with foundations 12" below

grade. The slab has a 4'-0" wide x 6" deep gravel perimeter and is
enclosed by a 8'-O" high mesh chain link fence with 3 strands barbed

wire on top and an entrance gate on the west side.

247 square feet.

Each

3 - 50 KVA "Westinghouse" transformers, serial

Nos. 6325287, 6323289, 6325281, H & N Nos, TRe215, TR-214, TR-209.

(The above list does not contain any user-furnished or user-installed

equipment, )

Construction Contract Cost

6G°L

Engineering Cost

16,417.01

618.96

17,035.97

XIQGNaddV

Installed equipment:

Over-all area is

Select target paragraph3