TOTAL COST II ELMER, CMR AREA (Continued) "TOA QUAN. UNIT DESCRIPTION OF PROPERTY UNITS BUILDING 341 (Continued) Watt "RCA" amplifiers, (no serial Nos.) H & N No. B-341, No. E-3h2; 1 - 2h" x 18" x 4” “Mullenbach” surface terminal cabinet, serial No. 18244, H & N No. E-335; H & N No. E-372; 1- 208 Y, main switchboard, (no serial No.), 1 = 10 gallon “Larco" water cooler, serial No. 9J07007 H & N No. CA-140; 1 "Kilpatrick" condensor dehumidification unit, serial No, 81450-10, H & N No. A-89-B; 1 = "Kilpatrick" evapo- rator dehumidification unit, serial No. 81450-2, H & N No. A-79-A; 1 vBCAY control console with microphone, (no serial No.), H & N No. E-169. (The above list does not contain any user-furnished or user-installed equipment. ) Construction Contract Cost Engineering Cost 187,200.63 193, 008.28 5,807.65 SUB-STATION 341 (T-27) Reinforced concrete slab located 9'-0" west of Building 341; dimen- sions 9'-0" long x 6'-6" wide x 6" thick, with foundations 12" below grade. The slab has a 4'-0" wide x 6" deep gravel perimeter and is enclosed by a 8'-O" high mesh chain link fence with 3 strands barbed wire on top and an entrance gate on the west side. 247 square feet. Each 3 - 50 KVA "Westinghouse" transformers, serial Nos. 6325287, 6323289, 6325281, H & N Nos, TRe215, TR-214, TR-209. (The above list does not contain any user-furnished or user-installed equipment, ) Construction Contract Cost 6G°L Engineering Cost 16,417.01 618.96 17,035.97 XIQGNaddV Installed equipment: Over-all area is