TOTAL COST II ELMER (Continued) “TOA OG- 1 QUAN. UNIT DESCRIPTION OF PROPERTY UNITS SECURITY FENCING AND LIGHTING (Continued) area at the administration compound and in the Administration Building as follows: 304 lineal feet of existing chain link and pipe post fence, 7'6" high and topped with 3 strands of barbed wire, at the north-east corner of the administration compound was removed and relocated, with alterations where required; the Military Police Station was relocated by the addition of a chain link partition and gate in the corridor of Building 208. Each E.C.O. 265 (Supplement No. 1) authorizes the installation of a security lighting system at the administration compound with the addition of twenty 35 foot No. 2 poles, No. 8 W.P. conductor, 31 wide angle flood lights, one transformer, and accessories. This work ac- complished by transferring the security lighting fixtures and appurtences from Station 1, Flora. Construction Contract Cost Engineering Cost bys Ler 11,675.30 566.11 12,241.41 THEATRE - OUTDOOR MOTION PICTURE - MODIFICATIONS TO E.C.0. 3700 authorizes the enlargement of the projection booth approximately 288 cubic feet to accomodate new motion picture pro- Installed equipment: 2 - 16 MM "Eastman" model 25 arc motion picture projectors, serial Nos. 1233, 1262, (mo H & N Nos.); 1 radio receiver, Each XIGNaUddvV jectors. Includes construction of new projector pedestals, enlarged sheet metal ventilators, installation of new speaker, amplifiers and necessary electrical wiring.