TOTAL
COST

II

ELMER (Continued)

“TOA

OG- 1

QUAN. UNIT

DESCRIPTION OF PROPERTY UNITS

SECURITY FENCING AND LIGHTING (Continued)
area at the administration compound and in the Administration Building
as follows:

304 lineal feet of existing chain link and pipe post

fence, 7'6" high and topped with 3 strands of barbed wire, at the
north-east corner of the administration compound was removed and

relocated, with alterations where required; the Military Police Station was relocated by the addition of a chain link partition and gate

in the corridor of Building 208.

Each

E.C.O. 265 (Supplement No. 1) authorizes the installation of a

security lighting system at the administration compound with the

addition of twenty 35 foot No. 2 poles, No. 8 W.P. conductor, 31 wide
angle flood lights, one transformer, and accessories.

This work ac-

complished by transferring the security lighting fixtures and appurtences from Station 1, Flora.

Construction Contract Cost
Engineering Cost

bys Ler

11,675.30
566.11

12,241.41

THEATRE - OUTDOOR MOTION PICTURE - MODIFICATIONS TO
E.C.0. 3700 authorizes the enlargement of the projection booth

approximately 288 cubic feet to accomodate new motion picture pro-

Installed equipment:

2 - 16 MM "Eastman" model 25 arc motion picture

projectors, serial Nos. 1233, 1262, (mo H & N Nos.); 1 radio receiver,

Each

XIGNaUddvV

jectors. Includes construction of new projector pedestals, enlarged
sheet metal ventilators, installation of new speaker, amplifiers and
necessary electrical wiring.