IT ELMER (Continued) TOTAL COST “TOA ctr iL QUAN. UNIT DESCRIPTION OF PROPERTY UNITS BUILDING NO. 222 - MODIFICATIONS TO To Building 222, an existing aluminum "Pacific" type building, the following modifications and additions were incorporated: The building was divided into seven rooms by 2" x 4" stud and plywood partitions reaching from floor to ceiling; in one room, the Dark Room, a 3'-9" x 2'-6" x 6" deep sink built into a wood stand was provided; 2 counters| one 10'-O" long and one 8'-0" long, work tables, benches, and a blackboard were constructed. A 3" C.1. waste line was installed from the new sink to a nearby sewer; a dry well for a drinking fountain was conskeucted, together with a 2" C.T. waste line and a 3/4" fresh water line; lighting was provided for a photography set-up, and all the necessary lighting, conduits, wiring and fixtures were provided throughout the building. Bach Installed equipment: 1 - 48" x 30" x 6" welded seamless stainless steel sink, H & N No. PL-70; 1 - 10 gallon "“Larco" water cooler, serial No. 8665377, H & N No. CA-155; 1 - 42" x 60" x 28" "Remington Rand" vault safe, serial No. 6028-B, H & N No. 0-754; 3 - 4 drawer legal size file safes with combination locks, H & N No. 0-716, 0-718, 0-719. (The above list does not contain any user-furnished or user-installed equipment. )} Construction Contract Cost Engineering Cost 14,154.06 680 .46 14,834.52 E.C.0,. 272 authorizes modifications to Building 313 as follows: Office space was made larger, and warehouse area made smaller by moving par- tition between the two 2h'-0" south; single roof made into double roof over new office space; sliding door relocated; 2 new 2" x kh" stud XIGNaAddV¥ BUILDING NO. 313 - MODIFICATIONS TO