TOTAL
COST

TI

ELMER (Continued)

“TOA

Ot L

QUAN. UNIT

DESCRIPTION OF PROPERTY UNITS

BUILDING NO. 194 (Continued)
H& N No. CA-127; 1 - 15.6 CFM "De Vilbiss" air compressor, serial No.

169272, H & N No. CO-50; 1 - 1/2 ton "Yale" trolley hoist, (no serial

No.), H & N No. TM-682. The following installed equipment was removed
from existing Building 211 (Greenhouse) and installed in Building 19};
1 - 7" “Queen City" bench grinder, serial No. 247555, H & N No. TM-218;

1 - 3/4 H.P. "Excello” carbide tool grinder, serial No. 1903, H& N

No. MA-27; 1 "Rivett" precision tool lathe, serial No. 141, H & N No.

MA-70; 1 "Columbian" vise, (no serial No.), H & N No. T™-618.

(The above list does not contain any user-furnished or user-installed
equipment. )
Construction Contract Cost

Engineering Cost

71,737.75

74,215.39

2,477.64

SUB-STATION 194, (T-23)
Reinforced concrete slab, located adjacent to the south wall of the
large unit of Building 194 and adjacent to the east wall of the small

unit of Building 194. Its dimensions are 9'-0" long x 8'-0O" wide,
and includes an angle frame, 5'-4" high x 4'-O" wide to support oil

fuse cutouts.

It is surrounded by gravel 6" deep, and enclosed by 4

6'O" high chain link fence with 3 strands of barbed wire on top and

an entrance gate on the east side.

Each

3 - 50 KVA "Westinghouse" oil-type transformers,

serial Nos. 6325286, 6323302, 6323293, H & N Nos. TR-216, TR-217, TR-218,
(The above list does not contain any user-furnished or user-installed

equipment. )

Construction Contract Cost

Engineering Cost

17,583.06
607.27

18,190.33

XIQGNGddV

Installed equipment:

Overall area is 133 square feet.

Select target paragraph3