TOTAL COST TI ELMER (Continued) “TOA Ot L QUAN. UNIT DESCRIPTION OF PROPERTY UNITS BUILDING NO. 194 (Continued) H& N No. CA-127; 1 - 15.6 CFM "De Vilbiss" air compressor, serial No. 169272, H & N No. CO-50; 1 - 1/2 ton "Yale" trolley hoist, (no serial No.), H & N No. TM-682. The following installed equipment was removed from existing Building 211 (Greenhouse) and installed in Building 19}; 1 - 7" “Queen City" bench grinder, serial No. 247555, H & N No. TM-218; 1 - 3/4 H.P. "Excello” carbide tool grinder, serial No. 1903, H& N No. MA-27; 1 "Rivett" precision tool lathe, serial No. 141, H & N No. MA-70; 1 "Columbian" vise, (no serial No.), H & N No. T™-618. (The above list does not contain any user-furnished or user-installed equipment. ) Construction Contract Cost Engineering Cost 71,737.75 74,215.39 2,477.64 SUB-STATION 194, (T-23) Reinforced concrete slab, located adjacent to the south wall of the large unit of Building 194 and adjacent to the east wall of the small unit of Building 194. Its dimensions are 9'-0" long x 8'-0O" wide, and includes an angle frame, 5'-4" high x 4'-O" wide to support oil fuse cutouts. It is surrounded by gravel 6" deep, and enclosed by 4 6'O" high chain link fence with 3 strands of barbed wire on top and an entrance gate on the east side. Each 3 - 50 KVA "Westinghouse" oil-type transformers, serial Nos. 6325286, 6323302, 6323293, H & N Nos. TR-216, TR-217, TR-218, (The above list does not contain any user-furnished or user-installed equipment. ) Construction Contract Cost Engineering Cost 17,583.06 607.27 18,190.33 XIQGNGddV Installed equipment: Overall area is 133 square feet.