QUAN, UNIT

TOTAL
COST

II

Yvonne (continued)

“TOA

Berl

DESCRIPTION OF PROPERTY UNITS

TANKS ~ ELEVATED - SALT AND FRESH WATER (Continued)
and salt water piping and valves, and an access ladder.

(No installed equipment. )

1

Each

1

Bach

1

Each

TANK - FRESH WATER STORAGE
Bolted steel, fresh water storage tank, capacity 7500 gallons, mounted
on a ground level platform.

(No installed equipment. )

TANK BUILDING - ACID

One-story wood and corrugated iron building, outside dimensions 8'-0"
x 12'-0" x 9'-0" mean height, floor area 96 square feet, volume 864

and Distillation Plant, Building 106.)
(No installed equipment. )

Construction Contract Cost
Engineering Cost

3,644.21
290.66

3,934.87

XIQGNGddV

cubic feet; constructed on previously existing concrete slab: complete
with 2h0 gallon capacity redwood acid tank, and all the necessary piping and valves. (Pumps and distillation equipment installed in Power