TOTAL COST YVONNE (Continued ) TI “TOA QUAN. UNIT DESCRIPTION OF PROPERTY UNITS WAREHOUSES «- GENERAL AND ELECTRICAL Wood frame construction, 16'-0" x 32'-0", supporting a 16 = man canvas tent, mounted on existing concrete slab; area 512 square feet. The General Warehouse is located approximately 10 feet north of the Latrine, Building 108, and the Electrical Warehouse is located approximately 25 feet south of the Reefer Building 105; contains the required electrical wiring and fixtures. (No installed equipment. ) Construction Contract Cost Engineering Cost Each 1,107.91 1,114.89 6.98 WATER DISTRIBUTION SYSTEM - SALT - REHABILITATION OF Consists of the complete rehabilitation of the salt water distribu- tion system which consists of 1070 linear feet of 4", and 283 linear feet of 3" transite pressure pipe, six service connections, and a previously existing concrete salt water well. (No installed equipment. ) 7 Sys tem WATER DISTRIBUTION SYSTEM - FRESH - REHABILITATION OF Consists of the rehabilitation of the fresh water distribution system transite pressure pipe, and five service connections. (No installed equipment. ) TANKS - ELEVATED - SALT AND FRESH WATER Two eteel, bolted 4200 gallon capacity tanks, one each for salt water and fresh water, elevated on a timber tower, 30'-0" high, constructed Leek on previously existing concrete piers. Contains ail necessary fresh Sys tem XIGNaddV which consists of 380 linear feet of 4", and 973 linear feet of 3"