SEWER SYSTEM - REHABILITATION OF
Rehabilitation of sewer system which consists of 1182 linear feet of

8" vitrified clay pipe, 5 corrugated metal manholes, 500 linear feet
of corrugated metal out-fall and 318 linear feet of 6" V.C. service

System

branches.

(No installed equipment. )
Construction Contract Cost

6&2 .11

682.11

TENT - 4-MAN
Wood frame and canvas construction; size O.D. ly'-2" x 1h'-4" x

11°-6"; anchor bolted to previously existing concrete slab; canvas

fly separated from tent roof by spacer blocks and fly ridge; complete

with electrical wiring and fixtures; area 208 square feet.
(No installed equipment. )

37

Bach

Construction Contract Cost 25,028.11

Engineering Cost

25,372 31

344.20

TENT - REFRESHMENT SHELTER AND PX

The shelter is a wood and canvas structure, size 0.D. 20'-6" x 46'-0"
x 10'-O" high; canvas roof over timber frame supported by 4” x 6"
square feet the volume, 9430 cubic feet.

The tent is a canvas on

wood frame structure, size 0.D. 14'-2" x 1h'-h" x 11'-6" erected on
previously existing concrete slab; canvas fly separated from tent
roof by spacer blocks and fly ridge, complete with electrical serv-

ices and fixtures; area 0.D. 203 square feet.

Bach

XIGNGddvV

posts on previously existing concrete piers, earth floor; area 93

Select target paragraph3