QUAN. UNIT TOTAL COST II YVONNE (Continued) “TOA DESCRIPTION OF PROPERTY UNITS SEWER SYSTEM - REHABILITATION OF Rehabilitation of sewer system which consists of 1182 linear feet of 8" vitrified clay pipe, 5 corrugated metal manholes, 500 linear feet of corrugated metal out-fall and 318 linear feet of 6" V.C. service System branches. (No installed equipment. ) Construction Contract Cost 6&2 .11 682.11 TENT - 4-MAN Wood frame and canvas construction; size O.D. ly'-2" x 1h'-4" x 11°-6"; anchor bolted to previously existing concrete slab; canvas fly separated from tent roof by spacer blocks and fly ridge; complete with electrical wiring and fixtures; area 208 square feet. (No installed equipment. ) 37 Bach Construction Contract Cost 25,028.11 Engineering Cost 25,372 31 344.20 TENT - REFRESHMENT SHELTER AND PX The shelter is a wood and canvas structure, size 0.D. 20'-6" x 46'-0" x 10'-O" high; canvas roof over timber frame supported by 4” x 6" square feet the volume, 9430 cubic feet. The tent is a canvas on wood frame structure, size 0.D. 14'-2" x 1h'-h" x 11'-6" erected on previously existing concrete slab; canvas fly separated from tent roof by spacer blocks and fly ridge, complete with electrical serv- ices and fixtures; area 0.D. 203 square feet. Bach XIGNGddvV posts on previously existing concrete piers, earth floor; area 93