TOTAL
COST

YVONNE (Continued)

II “TOA

QUAN. UNIT

DESCRIPTION OF PROPERTY UNITS

GENERATOR SHED - AUXILIARY

Wood frame structure, 10'-0" x 5'-O" x 8'-O" high, plywood on 3 sides
and plywood roof covered with one layer of composition roofing,

mounted on existing concrete slab, complete with electrical wiring
and fixtures.

Installed equipment:

Bach

2 auxiliary generators.

(The above list does not contain any user-furnished or user-installed

equipment. )

Construction Contract Cost

Engineering Cost

108.19

108 .87

68

LANDING PIER - CARGO AND PERSONNEL - REACTIVATION OF
Reactivation of Cargo and Personnel Pier consists of the replacement

of approximately 1800 square feet of 3" timber decking.
(No installed equipment.)

Bach

Construction Contract Cost 11,155.49

Engineering Cost

11,423.20

267.71

Rehabilitation of Power and Distillation Plant includes overhaul and

repairs or replacements of parts for three diesel engine driven generators with cubicles and panel boards, three distillation units,

_

r

Eel

pumps, diesel engine piping, distillation piping, ventilation equipment and ducts, fans, compressors and incidental equipment.

Each

XIGNaddv

POWER AND DISTILLATION PLANT - REHABILITATION OF