ELECTRICAL FACILITIES

Construction of electrical distribution system for camp services in-

clude 360 lineal feet of overhead #4 bare copper primary line; 1215
lineal feet of overhead #6 bare copper secondary line; 1340 lineal

feet of underground 3/c #6 tirex secondary line; seven 40-foot poles,
ten 30-foot poles, 5 transformers and service drops.

Conetruction Contract Cost
Engineering Cost

System

18,123.56
206.52

18, 330.08

FIRE AND FIRST AID BUILDING

One-story aluminum structure, 24'-0" x 20'-8-1/2" x 10'-10" mean

height, erected on previously existing concrete slab, double roof

separated by 2” x 4" redwood purline; contains vented window panels,

aluminum partitions; complete with electrical wiring and fixtures and

plumbing, counter and shelving; area 597 square feet, volume 6634
cubic feet.

Each

Installed equipment: 1 sterilizer, H & N No. D-1; 1 - 2h" x 30" x 13"
aluminum wall cabinet, H & N No. D-63; 1 - 31" "Simmons" adjustable

hospital bed, H & N No. D-153: 1 - 18" x 3421/2" x 24-1/2" aluminum
cabinet, H & N No. D-90; 1 - Adjustable mechanical chair, H & N No.

~De156; 1 = "Sturgis" utility chair, H & N No. 0-698.
(The above list does not contain any user-furnished or user-installed
2,971.13

53654

3,024.67

7)

Construction Contract Cost

Engineering Cost

XIGNaAddV

equipment. )

Select target paragraph3