quan] unit TOTAL COST YVONNE (Continued) II "TOA DESCRIPTION OF PROPERTY UNITS ADMINISTRATION BUILDING (Continued } complete concrete slab; vented window panels, aluminum partition; services; with electrical wiring and fixtures; existing fvesh water area O.D. 1072 square feet; volume 12864 cubic feet. Installed equipment: 1 - 10 gallon 50D017790, H & N No. CA-16}. 1 Each "Larco" water cooler, serial No. (The above list does not contain any user-furnished or user-installed equipment. ) Construction Contract Cost Engineering Cost 3,050.97 3,165.70 114.73 CARPENTER SHOP Wood frame structure, 28°-0" «x 20'-O" supporting canvas tarpaulin toy, 559 square feet; complete ecnstructeda on existing concrete slab, area with electrical wiring and fixtur--. 1 Eagqh 71869, Installed equipment: 1 - 16" "Dewalt" table saw, serial No. 4926, No. H & N No. C-13; 1 - 30" "Jones Superior” band saw, serial a & N No. C-10. user-installed {The above list does not contain any user-furnished or Terk Construction Contract Cost Engineering Cost 1,211.78 7-64 1,219.42 XIGNGddV equipment. )