UNIT

II

YVONNE (Continued)

TOTAL
COST

“TIOA

O¢el

QUAN.

DESCRIPTION OF PROPERTY UNITS

BUILDING NO, 122 - GARBAGE STORAGE SHED (Continued)
screen siding and corrugated aluminum roofing, erected on an existing

concrete slab; I.D. 7'-4k" x 7'h" x 7'-9" high, area 156 square feet,
volume 4h cubic feet; complete with plumbing, salt water piping and
steam piping.

(No installed equipment,)

Bach

BUILDING: NO. 125 - REEFER

A omeestory, wood frame, trussed building 34'-0" long x 33'-0" wide

x 11'-6" mean height, with plywood siding and wood louvers on three
sides, comnected to Mess Hall, Building 102, on the fourth side,
erécied op a 3b°-0" y 22'-O" x 5" thick concrete slab with continuous

footing 1'-6" deep.

Building contains three 12'-10" x 9'-O" walk-in

reefers, each with a compressor unit mounted on the exterior of the

building, one 8'-0" x 5'-10" walk-in reefer, 5 - 12'-0" long x 7'-

10-1/2" high shelf racks, and all necessary electrical conduits, wiring, and fixtures. Area 11¢¢ square feet, volume 12,903 cubic feet.

Bach

Installed equipment. 3 - 12'-10" x 9'-O" walk-in reefers, 1 - 8'-0"
x 5‘'-10" walkein reefer.

(The above list does not contain any user-furnished or user-installed
equipment. }
95,006.19
588 .96

ADMINISTRATION BUILDING
A reconstructed oneestory prefabricated aluminum building; size I.D.

2h'-0" x 4y'-8-1/2" x 12'-0" high, erected on a previously existing

95,999.15
XIGNGddV

Construction Contract Cost
Engineering Cost