TOTAL
COST

II

GENE (Continued)

“TIOA

92-1

QUAN. UNIT

DESCRIPTION OF PROPERTY UNITS

THEATER - OPEN AIR MOTION PICTURE (Continued)
Installed equipment:

2 - 16 mm. "RCA" sound projectors, (no serial

Nos.), H & N Nos. CA-53 and CA-522.

(The above list does not contain any user-furnished or user-installed
equipment. )
Construction Contract Cost

1,134.52

1,134.52

WAREHOUSE

One-story wood frame construction, rectangular shape, 0.D. 28'-0" x
50'-O0" x 17'-0" mean height, set on concrete slab. Gable roof with
corrugated aluminum roofing; 3/8" plywood siding.

electric wiring and fixtures.
volume 23,800 cubic feet.

Complete with

Floor area 0.D. 1400 square feet,

Bach

(No installed equipment. )

Construction Contract Cost
Engineering Cost

5,424 64
511.60

5,936.24

WATER FACILITIES - SALT WATER DISTRIBUTION SYSTEM
The salt water distribution system consists of approximately 1055

copper service lines, laid a minimum of 2'-6" underground. Included
in the salt water distribution system is one 4'-6" x 22'-0" deep (outside dimensions) concrete salt water well, complete with a 4" suction

line to the distillation plant.

(No installed equipment. )

stem

XIGNdddvV

lineal feet of 4" transite pressure pipe and 154 lineal feet of 1-1/h"