TOTAL COST II GENE (Continued) “TIOA 92-1 QUAN. UNIT DESCRIPTION OF PROPERTY UNITS THEATER - OPEN AIR MOTION PICTURE (Continued) Installed equipment: 2 - 16 mm. "RCA" sound projectors, (no serial Nos.), H & N Nos. CA-53 and CA-522. (The above list does not contain any user-furnished or user-installed equipment. ) Construction Contract Cost 1,134.52 1,134.52 WAREHOUSE One-story wood frame construction, rectangular shape, 0.D. 28'-0" x 50'-O0" x 17'-0" mean height, set on concrete slab. Gable roof with corrugated aluminum roofing; 3/8" plywood siding. electric wiring and fixtures. volume 23,800 cubic feet. Complete with Floor area 0.D. 1400 square feet, Bach (No installed equipment. ) Construction Contract Cost Engineering Cost 5,424 64 511.60 5,936.24 WATER FACILITIES - SALT WATER DISTRIBUTION SYSTEM The salt water distribution system consists of approximately 1055 copper service lines, laid a minimum of 2'-6" underground. Included in the salt water distribution system is one 4'-6" x 22'-0" deep (outside dimensions) concrete salt water well, complete with a 4" suction line to the distillation plant. (No installed equipment. ) stem XIGNdddvV lineal feet of 4" transite pressure pipe and 154 lineal feet of 1-1/h"