QUAN. UNIT

TOTAL
COST

II

GENE (Continued)

"TIOA

DESCRIPTION OF PROPERTY UNITS

PIPE SHOP

Wood frame structure, 26'-0" x 16'-0" x 10'-O" mean height, plywood
sides and floor, plywood roof with one layer composition roofing,

mounted on concrete footings; area 416 square feet, volume 4160
cubic feet, complete with electrical wiring and fixtures.
Construction Contract Cost

Engineering Cost

Bach

992 .09

1,003.51

11.42

P.0,, P.X., AND REFRESHMENTS
One-story wood construction, rectangular shape, 0.D. 16'-0" x 56'-

10" x 8'-10" mean height, set on concrete slab. Gable roof covered
with corrugated aluminum roofing; wood and screen siding. A 625

cubic foot prefabricated walk-in refrigerator is built into one end
of building. Complete with electrical wiring aod fixtures, plumbing
and bar fixtures. Floor area 0.D. 909 square feet. Volume 6029
cubic feet. Flake ice machine adjacent to building. This is a re-

habilitated structure removed from David.

Each

Te-L

Construction Contract Cost
Engineering Cost

3,180.60
47.08

3, 227 .68

XIGNGddV

Installed equipment: 1 - 675 cubic foot "Carrier" walk-in refrigerator, serial No. WR7-4716, H & N No. R-113; 1 flake ice machine.
(The above list does not contain any user-furnished or user-installed
equipment. )