TOTAL
COST

II

GENE (Continued)

“TOA

QUAN. UNIT

DESCRIPTION OF PROPERTY UNITS

BUTLDING 102 AND 109 - FUEL OIL TANK
Welded steel tank on elevated wood platform, capacity 1200 gallons.
Complete with piping.

Each

(No installed equipment.)

Construction Contract Cost
Engineering Cost

138,951.58
536 .60

139,488.18

AIRSTRIP
Construction of the airstrip consists of grading and stabilizing

approximately 19,120 square yards; and filling, compacting, and
stabilizing approximately 3000 cubic yards of aggregate.

(No installed equipment.)

Construction Contract Cost

19,120

Sq. Ydg.

55 5706 .03

_55,706.03

BARBER SHOP
One-story wood and pipe frame construction, rectangular shape, O.D.

8'-0O" x 10'-O" x 9'-O" mean height, set on 6" x 6" wood skids.

with electrical wiring and fixtures.
feet; volume 720 cubic feet.

Installed equipment:

Tt-L

No, CA-199.

Complete

Floor area 0.D. 80 square

1 "Kock" barber chair, (nc serial No.), H& N

Bach

XIGNGddV

Gable roof covered with canvas, canvas and plywood sides.