VOL, Il BOOK 6 CHAPTER IV The following was accordingly accomplished in the order of priority as listed: A, EXECUTIVE OFFICE 1. Resumed normal functions, 2, Manned Elmer telephone switchboard, Manned Yvonne telephone switchboard as required by Scientific Agencies, B. CONSTRUCTION-MAINTENANCE DIVISION 1, Supported Scientific Agencies in recovery of data and instruments from Stations 200, 600, 300, 520 and others. The work period had to be limited in certain cases as prescribed by Rad-Safe officials who stipulated the limits of radio-active exposure. Deep sea diving operations were necessary for the recovery of certain gauges. Station 50. Reset drums and reflectors and completed the station . Station 51, Checked location of radar reflectors and completed station for use. Station 309. Re-erected a Bilby Tower. Station 52. Re-erected the radar reflector. Station 806. Station 304, Moved and erected a prefabricated building. Erected one platform. Station 612, Removed existing pipe standard and replaced with a new one, Stations 621.10 thru 621.15. 10, Stations 802 and 803. ll. Station 804. Checked and serviced generators.,. Reset and serviced four generators. Cc. SERVICE OPERATIONS 1, Reactivated boats as needed, 6-54 Replaced rafts.