rm
.
-
ct tS
. SURISINE Te*eceaia
Iten
umber
one
Situation
I iI
Mit
Vehicles
Truck, 1/1, Ton
1L8 123
99
TG 7.1 Motor Pools
Truck, 2/k Ton
10, 8
69
TG 7.1 Hoter Pools
Truck, 23 Ton
2; 20
12
TC 7.1 Motor Pools
Truck, $ ton Pickup
2a 28
TG 7.1 loter Pools
Truck, Dscon
h
hk
2
TG 7.1 -otor Pools
Truck, Tractor
3
3
2
TG 7.2 sictar Pools
HOTES :
1.
The above estimatec requirerents meke no prevision for udditioral
ships to rormit an afloat operation at RIXINI since it is contempinted that
personnel will be able to remain on ENYU fer 1 shots.
In the evert personne?
ard aircraft musi be evacuated, firing will cease at SIKINI unless i'e ships at
TAQHCI are utiliced toa maintain opereticns aflcat.
If so, firings wuld then
cease at TAOUCT,.
2.
the requirerents are based on the assumptions included in this study.
For a specific oneration, they would have to be restudicd and adjustment: mads
accordingly.
3
The above d not include the ships, craft or aircraft required b: any
APSIP effects projects.
le
.
Ab TAO'GT 46 is folt thet there should be two large ships, one of
which is capable of handling and providing at least minimr maintonance
facilities for helicopters.