NINE
MULTIPLE ADDRESSEES
III.
ANALYSIS
A.
ON-SITE SAMPLE PREPARATION
THE SAMPLE PREPARATION AT EiiEWETAK LABORATORY WILL INCLUDE
RECORDI!dG ALL IMPORTA:IT INFORPiATION SUCH AS LOCATION, DATE,
SAi’lPLEDEPTH AN!) iJEIGtiT,ANo DRYING, HO!~OGENIZI;iGA!ID BALLIIIILLI}!G.INITIALLY, THE 100 METER PROFILES WILL BE PROCESSED
FOR FULL ANALYSIS TO PROVIDE EXPEDIENT DATA TO LLL FOR DOSE
ASSESSMENT;
THEN THE 50METER
FUTURE ANALYSIS,
B.
SP.YIPLESWILL BE PREPARED FOR
IF REQUIRED.
ON-SITE ANALYSIS
THE SWCIPLES ARE THE~i TRA?ISFERRED TO AN APPROXIMATE
700GIF1
GEOMETRY FOR GAMifA COUNTING FOR AH-241, EU-152, EU-155, CS-137
AND SPLIT; ONE PORTION IS SHIPPED TO EICALBUQ
LABORATORY AND
THE OTHER PORTION STORED IN THE SOIL LIBRARY.
THE SHIPPIP!G
CONTA1lIERS HAVE AN EIC PACKING LIST WITH EIC LABORATORY
NUMBER AND HAND COPY OF GANMA RESULTS WITH ISLA14D LOCATION
INFORMATION.
O1{-SITE GAMMA SENSITIVITY
APPROXIMATELY
1 VCI/G.
FOR GS-137 I!ILL BE
PU/AM CHEMICAL ANALYSIS MILL BE DOiiE ON
ISLAND AS LABORATORY LOAD PERMITS, WORKING TO THE GOAL OF
CHEMICAL A14ALYSIS OFTE!i PERCENT OF ALL 100 METER SAMPLES.
c.
OFF-SITE ANALYSIS
ANALYSIS
BY EIC IiiTHE ALBUQ LABORATORY IJILL INCLUDE RUNNING
CORALLIiiE SOIL SAMPLES FOR SR-9!3 ANDALL
OTHER PU/AM NOT
C04PLETED AT ENE!dETAK.
DOE/ERSP PROCEDURE NUNBER 15 ASSU[,lESSECULAR EQUILIBRIUM OF