a.
oelas
oo) Sp ‘eq
;
lo
*00Mu
@5. “ey
5
eg
“op,
Unit aircraft are mershaled os requiree by that Unit.
(10)
ec.
;
Provide for complete care » storage and issue’ of personal —
equipnent to ali aircrews of the fest Servicos Unit.
Test Support Unit:
(1)
°
4
Assure that transiont traffic and airlift oporations do not
interfere with or endanger test aircraft operations curint
the Y~Day mission. (See Annex A, TG 7.4 Operations Order
254).
'(2) -Provide two (2) C-47 aircraft for VHF relay for the Y-Dey
mission. (Sec Annex P, TG 7.4 Operations Ordor 2-54).
(3)
Establish required measures to prevent movement of vehicles
from interfering with or endangering air oporations throught
Y~Day.
(4)
Provide adequate crash ronoval. and firo fighting protection
(5)
Place one (1) H-19 helicopter under the operational control
of the SAR Clemont Commander and one (1) erash boat under: +
for all air -operations on X.Day.
the operational control of the AOC fron 27 Fobruary 1954. and
continuing throughout the project.
Operations Order 2~54).
(Seo Annox FT, TG 7.4 ,
-
(S$)
Assure adequate rofueling and field maintconance support, for
(7)
Provide photographic coverage Gurins Y~Day ovorations for
historical purposes.
all aircraft dyring the tDay taission.
(8) In coordination withother Tost Units, assure adoquate transportation schedules from the flight linc to the dining halls
_ and billeting areas throughout the Y-Day operations.
($)
x.
Coordinate with Test Mreraft Unit to assure thet C-47 re~
fleetor aircraft are marshaled as roquired by that Unit.
All Units:
(1)
Provide Liaison Officers to assist Headquarters » TG 7.4 aircraft controllers in the AOC, on the Sommond Ship and Con-
trol Destroyer as required.
Order 1-53).
(2)
(Sco fnnex K, TG 7.4 Operations
Coordinate with Test Support Unit toarrange required early
dining schedulos, in-flight lunches, transportation, ote.;
for the Y-Day mission.
:
:
(3)- Adhere to security procedures ‘as outlined in Annex G, Scourity
and Public Information, TG 7.4 Operations Order 1-53.
.
(4) Zuphasize the Flight Safoty Program outlined in Annox L,
,
Flight Safety, TG 7.4 Operations Order 1-53.
(5) Bo prepared to augnent cxisting SAR facilities in omergen-
. (6)
cies during the Y-Day operation.
Be prepared to postpono execution of the mission for such
TASK GROUP 7.4
OPRS ORDER HO. 8-54.
f
-
Docjy
°°0 og
.
.
o
,
en