FACILITY

The

NO.

structure

- CONSOLIDATED

is a triple

roafing

120

facility

h~ses

Metal,

641

feet

Electrical,

x 120
various

40-foot
feet,
Holmes

Refrigeration,

MAINTENANCE

bay steel

constructed

framed

building,

on a concrete

& Narver

Base

Plumbing,

-26-

/

SHOPS

Support

Automotive

slab.
shops
and

with

aluminum

This

recently

including
Heavy

siding

modified

Welding,

Equipment

and

Sheet
Repair.

Select target paragraph3