The. plan for the four new weather stations is to be based on the Tarawa plan,
with minor exceptions, namely:
a.
Move antennas so that not more than 150! of drop-lead to the Operations
Building No. 5 is necessary. The. antenna can be directly over the
building if required.
b.
.
Move the latrine from the barracks building to the day room and provide a
shed for laundry facilities.
These instructions supersede the design requirements for weather stations in
paragraph 3 of JTF-7 letter.
the Wotho Station.
3.
The Rad-Safe Station is still to be similar to~
.
Review the generator capacity at the existing stations to ascertain if it is.
sufficient to carry the additional load of the ice making machine and electric
grill-requested in paragraph 7 of JTF-7 letter. If larger generators are
required make provisions in your estimate.
"Therefore, you are requested to prepare an estimated construction schedule which
will show the number of days required after notification of availability of funds."
Teletype reference (C) is quoted as follows:
"HOHNER TO SANDERS INFO LT CGL WALTER A GRAY.
REF MY LTR ETE: FWH-33 DATED FEB 26,
1957 IN REGARD TO WEATHER AND RAD-SAFE STATIONS.
DUE TO MISINTERPRETATION OF
REQUESTED COMPLETION DATE DISREGARD FIRST SENTENCE OF NEXT TO LAST PARA AND ALL OF
LAST PARA OF LTR.
PROVISIONS WILL RE MADE FCR FUNDING OF CONST IN FY 1958 BUDGET
NCW UNDER PREPARATION.
REF ETE:FWH-3))5"
Authorized for Engineering
and Design:
é
Fred W. Hohner
AKC Contract Represe Awe
I
Project Manager
e
f
» R, Alvy
Engineering Manager
(For Distribution, see Page 3)