Refraduced from.fhe poldings of the Naffonal Archives -ie Sls if Region DECLASSIFIED PER DOR LS°TER DATED JULY, 15, 1994 A060 4,7 HOLMES & NARVER, INC. Engineers-Constructors fo DIANE S. NIXON RRA: ERBimy E.0. 98, Rev. 1 Typed: | 3/13/57 To: Project Engineering File a From: Chief Project Engincer _ Jobs . '.Re: March 13, 1957 © 92 New Weather Observation Stations , at (1) Nauru, (2) Rongerik, (3) Truk and (i) Ponape ACTION RESIDENT MANAGER, EPC; Chief Estimator Identification No. Item (1) - 19530 (2) - 195h0 (3) - 19550 (4) - 19560 Reference NATIONAL ARCHIVES elon PAC{FIC SoyTHwWes Tl KE ion £E 306 ATOMIC ENERGY) Commission COLLECTIO . BOX No, 22620 (#LE) Alel6Y 326-658 780 - Fotpen M4vky sScAMy ip Ns, 1953 (A) Confidential letters J-l/000.93 dated 2-11-57, 2-1-57, 1-30-57 and 1-28-57 may be seen in Project Engineer Files. Copies of same will be transmitted to Jobsite. (B) Letter ETE:FWH 33 dated 2-26-57 (H&N 38228). (C) Teletype Hohner to Sanders dated 2-27-57. H&N Account No. 95005/95105 Description of Work The issue of this Engineering Order authorizes the above action addressees to prepare separate plan sets, separate cost estimates and construction time schedules for the construction of each of the Weather Observation Stetions at Sites Nauru, Rongerik, Truk and Ponape, all in accordance with feneral requirements outlined in Paragraph 3 of reference confidential letter (A) dated February 11, 1957, and as modified by reference letter (B), corrected with reference Teletype (C). Plans and cost estimates will be forwarded to Home Office Estimating Department for further processing. Reference letter (P) is quoted as follows: "You are hereby authorized to desigm and prepare estimates for Weather and Rad-Safe Stations as requested in JTF-7 letter dated February ll, 1957. "Estimates should be prepared for each single location for both the new stations and the rehabilitation of existing stations as funding for this project has not been definitely determined. "During recent meetings in Washington various suggestions in regard to design were offered as follows: l. : . Tanks for potable water are to be fabricated of non-corrosive material. OFBFICIALUSE-OTE Y £.0. 98, Rev. 1

Select target paragraph3