28 May 1959, J-6 Report:
cree
Actual work at the EPG is as well as
planning for an openseas concept are continuing.
As for NTS, plans
for the 4 1100-foot deep 36" diameter vertical holes in area 3 have
B y
bean«Ini tiated while the plans for xke Rainier Mesa area have been
cancelled while specific details of the hole criteria have been
forwarded to H&N the latest information is that DMA will authorize
n
design and preparation of bid documents but will delay authorizatio
to Invite bids until some unspecified later date; the estimate of
~
cost for the entire [100 foot hole development is about 1.9 million
dollars.
Other activities at the NTS include a review of the
(1. containment) site and agreement that it will not interfere
with LASL activities.
Discussions in May of 59 between the Army and JIF-7 are addressing the
construction requirements for Johnston Island for two different projects, Willow
~e
and Nike-Zeus.
@ ‘
Each side wants to know what the other plans to do so that the
construction can be coordinated and best use of overlap can be made.
I am not sure
but that the Willow planning is to use the Redstone and specific faciltities at J.I.
but I haven't seen details that say this.