i ent recess in the Geneva 26 woorivx from DNA notes that following the curr Qenenmreniny, e return to Geneva i{ks It Is desired that Graves and Dr. Sterling Colgat that their participation » participate in the discussions beginning 8 June and 2 Iimlted to about slx weeks. 28 May 1959, J-6 Report: cree Actual work at the EPG is as well as planning for an openseas concept are continuing. As for NTS, plans for the 4 1100-foot deep 36" diameter vertical holes in area 3 have B y bean«Ini tiated while the plans for xke Rainier Mesa area have been cancelled while specific details of the hole criteria have been forwarded to H&N the latest information is that DMA will authorize n design and preparation of bid documents but will delay authorizatio to Invite bids until some unspecified later date; the estimate of ~ cost for the entire [100 foot hole development is about 1.9 million dollars. Other activities at the NTS include a review of the (1. containment) site and agreement that it will not interfere with LASL activities. Discussions in May of 59 between the Army and JIF-7 are addressing the construction requirements for Johnston Island for two different projects, Willow ~e and Nike-Zeus. @ ‘ Each side wants to know what the other plans to do so that the construction can be coordinated and best use of overlap can be made. I am not sure but that the Willow planning is to use the Redstone and specific faciltities at J.I. but I haven't seen details that say this.

Select target paragraph3