SP AER RTE TO, ater
.
EMRE
%
oe
i
rey
erapreren
Overatior, clan
CTG 7.3 No, 1-53
Sil?
|
HOT 200L |
Syree
is gilt NYRREE
PluCe
lst Eehelon, SN DIEGO
1
;
Dats
suVB
rlgCh
10-17-59 | ENIWSTOK
|
| WSMARKS
—
11-2-53 4 LCM in USS COLONIA
2d Echelon! Sal DIEGO
10-453
3rd _Eoholon Sul DIEGO.
GHOVE
_l-2nSl BIMINE___1=?0~54In SELIG
;
ENIWSTOx
DATS
eel
:
' 12-2-53
.
:
2 Lt, 12 LOM via
‘ST, MAxION &
'GUNSTON Hil
Shipa end units are expected to be sailed to the forward ayer vy type cen-
vanders er other ecommrnders having aperetional control, and to repart ta CTG
7.3 fer operational control as dirceted, yoncrally upon emsasing the voundary
of thy Dancer srea,
4,
Preparation Phase
a,
The Preperation chase in the forward area commences on 16 Janurry
with the arrivel ef the first aTP with the YCV and YFN, and is eherocterized
by operatiens to prepare, trensport and instrument the special device for
the first saot, amd to rehearse the taska which must be performed innedLately
before, during end efter this shot. Certnin specific eperrtions not involvizg
ell units nor containcd in ether annexes, will be perforned during this
period and cre listed with © designation of the performing unit in antielpated ehronolo;zical order,
Overation
(1)
(2)
BY
Mooring ef YCV near shot site prior 17 Jan,
Mooring of YFN near LSD puoy at BIKINI prior
LIF of 7.3.5
aTF of 7.3.5
17 JONs
(3)
Planting of twenty buoys for LOM noorings prior
Unit of 7.3.5
20 Jan,
(4)
(5)
(6)
Commence helicopter inter-island transportation
Fodee
Commence brat paol inter-island transportation
70307
systeat BIXINI 20 Jen,
,
systen at BI:INI 22 Jer,
Yosition and assist in instrumentation of lagoos
falleout refts of erojeeta 2,5a
GAELS
bn}
70305&
Pode?