OPERATIONS PLAN LLL RADIOECOLOGY- AND DOSE ASSESSMENT PROGRAM AT ENEWETAK ATOLL -3- Travel Orders and MAC reservations for the appropriate MAC flights. Coordination of this operations plan with all concerned parties prior to the arrival of LLL at Enewetak and coordination of any changes which occur during the mission. Enewetak Base Support required: 1. Enough food for seven people for two weeks to be purchased from storage for use at Enjebi. Use of the backhoe, multi-hoe, two dump trucks, three 4x4 personnel carriers, and the two mules. Operational readiness of the LLL water truck filied with 3000-5000 gallons of water. Use of the other 12.5 KW generator for use as backup for the trailer at Enjebi. All gear and equipment shipped to Enewetak ready to be transported to Enjebi or transported previous to November 30. Assistance from H&N man designated to support LLL Garden Project, 25% of his time. Full time support for this individual during the 2 week period would be desirable if it can be arranged. Aqua sport boat availability and assistance with putting it in the water. Mike boat transportation as follows: a. One trip prior to November 30 to transport full water truck, diesel fuel tanks to fill 500 gal. tank at Enjebi and 200 gal. in drums and 200 gal. of gasoline in drums. b. One trip each day on December 1 and December 2 to transport remaining LLL equipment and supplies. If two trips cannot haul all of the LLL equipment a third trip will be required. c. One trip may be required at some point during the twoweek period for resupply of food, water or fuel, or some other unforeseen requirement.