OPERATIONS PLAN
4.
B.
-3-
Frozen cargo transfer and storage MAC flight to Hono
February 15.
Enewetak Base Support
i.
Billets
4 people nights of January 31 and February 14
LLL
January
U of H
R. Buddemeier
*D. Buddemeier
17
S. Goff
B. Tilbrook
W.
E.
J.
M.
M.
3 thru 24
3 thru 24
3 thru
10 thru 31
S.
Wheatcraft
W. Souza
McConachie
Stroup
Coleman
Atkinson
DeCostra
S. Smith
*R. Redalje
*S. Weil
7
17 and 31
17 and 31
17 and 31
17 and 31
17
24
*S. Petty
February
14
14
7 and 14
7
17 thru
7
24 thru
24 thru
7
7
*denotes female
Messrs. Stroup, Coleman, Atkinson and DeCostra will stay in
Enjebi trailer January 11 through January 17th and some
may stay at Enjebi the following week
Enjebi Base
a.
Food,
full water truck, fuel,
linens, large tent and cots
if available.
b.
Generator, operational,
c.
J mule and 4 x 4, operational.
d.
15 5-gal. drums gasoline for vehicles and 3 55-gal. drums 80
octane gas for air samplers (can substitute mogas if
necessary), 1 case motor oil, 5 gal. hydraulic fluid.
e.
1 operational whaler (to be shipped from Kwajalein) .
f.
3 radios
(l base and 2 handie talkies).