PRIORITY 30R JLCCOMPLIS-T
1.
~
Reconstructiotiof dock end unloading ramps. lktablishment
of primary signal facilities with power (Homer, Air Ground~ PO tit to
Point)*
b.
Atoll).
2*
Repair of landing strips (to include the other airfield on
(Est. 70 man dayu).
lbtablisbment of water, electrical, refrigeration, and hospital
f~cilitiee for initial force.
a.
(Est. 429 man -s).
ions for initialforce
Establishment of messingand housing ixaiatallat
wtth alnimus recreational fuc$llties, and road repair (Latrines and
● esses
only to b e screened and pa$nting to be llmlted to that essential for prvention maintenance). (Est. 6424.
Establishment of oable distribution system, telephone central &
air-ground route controu
5.
days).
(Sigxd percmnel only).
Establishment VIP accommodations for 15 personnel,
(Est 108 man
din).
6.
Construct
ion of POint to Point
Shaft
or ad
7*
Development of retreational faciZitieafor initialforce (Est.63
Signal Centore
(Signal
radio teletype channel +1 to Xort
personnel only).
man days).
8.
ion,w ●ter and haspitalizat
ion
Enlargement of electricity, refrlgerat
f~ilit lee to accoamodate 2300 personnel. (Est. 238 man days).
9.
Installation of 2 M-610~s with doublet antenna to BLOCXEOUSE (1
55
S~TIOM
V
““* “--” ‘s