for local inter-ishnd ferrying. There wil,lbe installations on various islknd~ which will require sup?ly by beri~l drop. Availability of equipment for aerial supply drops should be cuecked. ~vailability of these aircraft for this project on 1 January ad is as follows: one (1) on 1 December, two (2) one (1) on 1 February. Oper~tiond control of these &ircraft will rebmin with the MC Commuder on Kwajalein unt”ilthe arrival of the Task WiW Commander. ATC will continue to provide crews and maintentmce for the duration of the project. 2. &s further information become avail~ble, it to you. BY COMMND OF MAJOR GWXEAL &RPER JOHN’ELDAVIES Cy furnished Gen Kepner 29 SECTIONV ,.4 will “beforwarded

Select target paragraph3